This week ground drilling and micro piling will be taking place related to construction of the Enhanced Clinical Learning Facility adjacent to the Lifetime Learning Centre at OVC. Drilling will be taking place between 7:30 a.m. and 4:30 p.m. throughout this week. Sound may carry into adjacent areas.
As well, please note: A temporary fire exit has been constructed through the courtyard beside the OVC cafeteria. As part of the fire regulations, the yellow pathways marked on the cafeteria floor MUST be kept clear of tables and chairs at all times. As well, to meet fire code regulations, it is not possible to close off part of the cafeteria for special events.
Exterior hoarding and fencing has been placed around the perimeter of the construction zone and site demolition and excavation continue.
Exterior pedestrian walkways and sidewalks between the OVC Main Building and the Pathobiology/AHL building are no longer available. As well, the sidewalk leading from the OVC Main Building to Gordon (located between OVC Main and Pathobiology) has been closed.
Access to both buildings is available through the Lifetime Learning Centre.
Stay tuned to the Bulletin for further updates.